Wednesday, October 29, 2014

A Message From Warren



On Monday, November 3, the traffic pattern on South Boulevard will be modified to prepare for paving the asphalt surface on the south side of the roadway.


Eastbound traffic will be prohibited from utilizing South Boulevard between USH 12 and Industrial Court. This portion of the roadway will be opened to westbound traffic via Sauk Avenue and Industrial Court. Eastbound traffic between Industrial Court and Lynn Ave. will utilize the north lane of South Boulevard. South Boulevard will remain closed to westbound traffic between Lynn Ave. and Industrial Court. The Lynn Avenue detour will remain in place during this stage. Paving is scheduled for Tuesday November 4.


Changeable message signs will be deployed on USH 12 to aid motorists in accessing South Boulevard during this stage of the work.



Warren Mohar, PE | Senior Project Engineer
MSA Professional Services, Inc.
(608) 356-2771



No comments:

Post a Comment